build-a-bridge-1981-82

1981-82

The Lake Onslow Dam was built for the Otago Central Electric Power Board in a single summer season. The crest of the dam is 684 metres above sea level. We camped on site and batched our own concrete. We built the Kowhai Power Station on the same Teviot River in 2009-10.

Categorised in: